Routine survey scope, in order of risk.

Instead of surveying the whole farm on the same cycle, start with the riskiest foundations and cable segments, and keep the rest on the statutory and insurance cycle.

In practice

A week for the O&M team

01

Monday: Operations

Risk, alerts and the 7-day vessel window for all farms.

02

Farm review

Foundation ranking, cable segments and satellite evidence with reasons.

03

Assign surveys

Pick targets and order in the survey plan and send the work-order CSV to the contractor.

04

Feed results back

Add survey results to calibrate the model and mark items done.

Effect

Demo farm calculations

FarmFull campaignTargetedSaving
Southwest Sea demonstration₩182.2M₩55.6M69.5%
Tamra Offshore Wind₩80.5M₩36.9M54.2%
Horns Rev 1₩569.7M₩130.6M77.1%

Pilot calculation at demo unit costs (14 Nov 2026). Real savings depend on farm size, contract rates and statutory cycles.

Pilot analysis

Send us the wind farm name. We send back a first report.

Tell us the location, number of turbines and foundation type. We build the layout from satellite detection and return a first report with scour per foundation, exposure risk per cable segment and a survey priority list.