Do not survey everything. Start where it matters.
Assign MBES and ROV inspection to the riskiest assets first and compare the cost with a full campaign. Hand the result over as a PDF report and a work-order CSV.
Rule
What goes into the plan
The riskiest 25% of assets plus anything over its allowance or with exposure of 90 or more. Unit costs are set in Admin.

Demo account. Horns Rev 1 demo: full campaign ₩569.7M (80 foundations + 61.6 km cable) vs. targeted ₩130.6M (37 of 146 candidates), saving ₩439.1M (77.1%).
Pilot calculation
Three demo farms
Demo scan of 14 Nov 2026 at demo unit costs (KRW).
| Farm | Full campaign | Targeted | Targets / candidates | Saving |
|---|---|---|---|---|
| Southwest Sea demonstration (60 MW) | ₩182.2M | ₩55.6M | 12 / 47 | 69.5% |
| Tamra Offshore Wind (30 MW) | ₩80.5M | ₩36.9M | 4 / 15 | 54.2% |
| Horns Rev 1 (160 MW) | ₩569.7M | ₩130.6M | 37 / 146 | 77.1% |
Satellite screening narrows the campaign. Keep statutory and insurance surveys for assets that are not high risk.
Outputs
What the survey team receives
Priority table
Type (foundation or cable segment), asset, score and reason (mobility, vessels, burial).
Status
To do, planned, done or skipped.
PDF report
Farm risk, alerts, ranking and reasons.
Work-order CSV
A list that drops straight into the contractor and vessel schedule.
Related pages
Pilot analysis
Send us the wind farm name. We send back a first report.
Tell us the location, number of turbines and foundation type. We build the layout from satellite detection and return a first report with scour per foundation, exposure risk per cable segment and a survey priority list.