Routine survey scope, in order of risk.
Instead of surveying the whole farm on the same cycle, start with the riskiest foundations and cable segments, and keep the rest on the statutory and insurance cycle.
In practice
A week for the O&M team
Monday: Operations
Risk, alerts and the 7-day vessel window for all farms.
Farm review
Foundation ranking, cable segments and satellite evidence with reasons.
Assign surveys
Pick targets and order in the survey plan and send the work-order CSV to the contractor.
Feed results back
Add survey results to calibrate the model and mark items done.
Effect
Demo farm calculations
| Farm | Full campaign | Targeted | Saving |
|---|---|---|---|
| Southwest Sea demonstration | ₩182.2M | ₩55.6M | 69.5% |
| Tamra Offshore Wind | ₩80.5M | ₩36.9M | 54.2% |
| Horns Rev 1 | ₩569.7M | ₩130.6M | 77.1% |
Pilot calculation at demo unit costs (14 Nov 2026). Real savings depend on farm size, contract rates and statutory cycles.