Offshore wind subsea risk glossary

Plain-language definitions of terms used in TIDEWATCH screens and reports.

TermMeaning
ScourA hole eroded in the seabed around a structure by flow. Around offshore wind foundations it is caused by waves and currents.
Equilibrium scour depthThe depth at which scour stops growing under steady conditions.
Bed shear stressThe force of the flow on the seabed. It is larger when waves and currents act together (Soulsby 1997).
Shields numberA dimensionless number that says whether bed shear is strong enough to move sediment grains. Above the critical value, sand moves.
KC number (Keulegan–Carpenter)Ratio of the wave orbital excursion to the foundation diameter; it controls wave-induced scour.
Significant wave height (Hs)Mean height of the highest third of waves; also used as a vessel operating limit.
Tide levelSea level rising and falling with the tide.
d50Median sediment grain size. Finer sand moves more easily.
Burial depthThickness of soil covering a subsea cable. Thinner cover means higher exposure risk.
Array and export cablesCables linking turbines (array) and linking the farm to shore (export).
Jacket and monopileFoundation types: a lattice of steel tubes, or a single large steel pile.
MBESMultibeam echosounder; surveys seabed topography from a vessel.
ROVRemotely operated vehicle; inspects foundations and cables up close.
SARSynthetic aperture radar; sees land and sea through cloud and at night (Sentinel-1).
GRDGround-range detected SAR product, used to detect vessels and structures.
Sediment plumeA muddy streak of suspended sediment trailing downstream of a structure.
Weather windowA period when waves and other conditions stay within operating limits so a vessel can work.
Scour protectionRock armour or similar placed around a foundation to prevent scour.

Pilot analysis

Send us the wind farm name. We send back a first report.

Tell us the location, number of turbines and foundation type. We build the layout from satellite detection and return a first report with scour per foundation, exposure risk per cable segment and a survey priority list.