On a real farm, against real surveys.
Together we check how well the TIDEWATCH ranking matches survey results on an operating farm and how far it can narrow the campaign. Below is an example; scope and timing are agreed together.
How it runs
Four steps (example)
First screening
Layout from satellite detection using the farm name and location, and a first report from public data.
Connect and calibrate
As-built coordinates, cable routes, foundation details, grain size, burial depth and past MBES/ROV results fit the model.
Compare with surveys
At the next routine or urgent survey, compare the ranking with what was found.
Into operation
Continue with a per-farm subscription and agree how to connect to your systems.
What to prepare
Ground truth from the site
Farm details
Turbine coordinates, foundation type and diameter, cable routes and burial design.
Survey records
Scour depth, burial depth and exposed segments from past MBES and ROV surveys.
Operating criteria
Scour allowance, vessel operating limit, survey unit costs.
Reviews
Regular reviews with O&M staff to tune alert criteria.
What you get
What remains after the pilot
Farm risk map
Foundation scour, cable segment exposure, satellite evidence.
Comparison
TIDEWATCH ranking vs. actual survey findings.
Survey plan
Targets, order, saving and a work-order CSV.
Calibrated model
Computation fitted to your farm from the next survey on.
FAQ
Frequently asked questions
What does it cost?
It depends on farm size, duration and integration scope. We suggest reviewing the first report and then agreeing terms.
Can we start without all the data?
Yes. Start from public satellite and ocean data and add farm data as it arrives.
Can overseas farms join?
Yes. Public data cover the world, so we can start the same way.
Related pages
Pilot analysis
Send us the wind farm name. We send back a first report.
Tell us the location, number of turbines and foundation type. We build the layout from satellite detection and return a first report with scour per foundation, exposure risk per cable segment and a survey priority list.