On a real farm, against real surveys.

Together we check how well the TIDEWATCH ranking matches survey results on an operating farm and how far it can narrow the campaign. Below is an example; scope and timing are agreed together.

How it runs

Four steps (example)

Step 1

First screening

Layout from satellite detection using the farm name and location, and a first report from public data.

Step 2

Connect and calibrate

As-built coordinates, cable routes, foundation details, grain size, burial depth and past MBES/ROV results fit the model.

Step 3

Compare with surveys

At the next routine or urgent survey, compare the ranking with what was found.

Step 4

Into operation

Continue with a per-farm subscription and agree how to connect to your systems.

What to prepare

Ground truth from the site

01

Farm details

Turbine coordinates, foundation type and diameter, cable routes and burial design.

02

Survey records

Scour depth, burial depth and exposed segments from past MBES and ROV surveys.

03

Operating criteria

Scour allowance, vessel operating limit, survey unit costs.

04

Reviews

Regular reviews with O&M staff to tune alert criteria.

What you get

What remains after the pilot

01

Farm risk map

Foundation scour, cable segment exposure, satellite evidence.

02

Comparison

TIDEWATCH ranking vs. actual survey findings.

03

Survey plan

Targets, order, saving and a work-order CSV.

04

Calibrated model

Computation fitted to your farm from the next survey on.

FAQ

Frequently asked questions

What does it cost?

It depends on farm size, duration and integration scope. We suggest reviewing the first report and then agreeing terms.

Can we start without all the data?

Yes. Start from public satellite and ocean data and add farm data as it arrives.

Can overseas farms join?

Yes. Public data cover the world, so we can start the same way.

Pilot analysis

Send us the wind farm name. We send back a first report.

Tell us the location, number of turbines and foundation type. We build the layout from satellite detection and return a first report with scour per foundation, exposure risk per cable segment and a survey priority list.